transect diagram of a shoreline community with groundwater underneath the soil

Look Out Below

Reducing the risk of groundwater rise in Bay shore cities

Illustration of houses plugging into electricity

Closing the Electrification Affordability Gap

Planning an equitable transition away from fossil fuel heat in Bay Area buildings

illustration of yellow houses on a dark blue background

Structured for Success

Reforming housing governance in California and the Bay Area

people sitting in a parklet with a colorful mural outside a cafe

The 15-Minute Neighborhood

A framework for equitable growth and complete communities in San José and beyond

sf cityscape

Office-to-Residential Conversion in Downtown SF

Can converting office space to housing help revitalize downtown?

illustration of a vibrant neighborhood with cyclists, pedestrians, bike lanes, benches, trees

The 2024 SPUR Annual Report

Celebrating our big wins of the past year

San Jose's First BART Station: More Than a Transit Project

News /
The opening of San Jose’s first BART station marks an important moment for the city. After decades of planning, San Jose will finally connect to the regional rail system. But the potential benefits extend far beyond the station. The city has a unique chance to create a dynamic urban village at Berryessa, its first station, and set a strong precedent for future station area development.

Designing a More Resilient Bay Area

Urbanist Article
The year-long Resilient by Design Bay Area Challenge brought together local residents, public officials, designers and engineers to develop innovative proposals that can strengthen the Bay Area’s resilience to sea level rise, severe storms, earthquakes and flooding. The nine final design concepts are meant to inspire, catalyze action and push us all along the path to a more resilient future.

Remembering Michael Painter

News /
Noted landscape architect Michael Painter, a former SPUR board member, board chair and 2014 Silver SPUR Award honoree, passed away on June 28. Michael’s long and prolific career left a great legacy in the Bay Area and across the country, with 856 finished projects and 49 years of service.

At Last, the Tide Turns on Downtown Oakland’s Office Market

News /
Downtown Oakland now has the tightest commercial market in the country, with a vacancy rate of 5.3 percent. As a result, commercial rents in downtown Oakland have shot up. After many years of construction costs stubbornly remaining higher than commercial rents, it has finally become financially feasible to build new office buildings downtown.